Outsulation MD with Securock ExoAir 430 (DS907) An Exterior Insulation and Finish System With Engineered Moisture Drainage That Incorporates Continuous Insulation and A Pre-Applied Air/Water-Resistive Barrier.
Printer Friendly Set of Outsulation MD with Securock ExoAir430 Details in PDF formatPrinter Friendly Set of Outsulation MD with Securock ExoAir430 Details in DWG format
Table Of Contents:
Description | PDF File |
Table of Contents | |
Detail Cover Sheet | |
System Details | PDF File |
Outsulation MD Securock ExoAir 430 System | OMD SE430 - 1 |
Building Facade | OMD SE430 - 2 |
Dryvit Vent Assembly | OMD SE430 - 3 |
Insulation Board | OMD SE430 - 4 |
Isulation Board Layout | OMD SE430 - 5 |
Board Joint and Fastener Treatment | OMD SE430 - 6 |
Rough Opening Preparation | OMD SE430 - 7 |
OPening Flashing Integration | OMD SE430 - 8 |
Inside/Outside Corners | OMD SE430 - 9 |
Outside Corner - High Impact | OMD SE430 - 10 |
Grade Termination | OMD SE430 - 11 |
Termination at Concrete Curb | OMD SE430 - 12 |
Termination at ADA Compliant Sidewalk - Tremco Option | OMD SE430 - 13 |
Temrination at ADA Compliant Sidewalk | OMD SE430 - 13a |
EPS Preparation at Wall Penetrations | OMD SE430 - 14 |
Storefront Window Sill - Jamb | OMD SE430 - 15 |
Storefront Window Head | OMD SE430 - 16 |
Termination at Wood Framed Deck | OMD SE430 - 17 |
Termination at Waterproof Deck | OMD SE430 - 18 |
Preparation at Parapet/Wall Intersection | OMD SE430 - 19 |
Preparation at Parapet/Wall Intersection | OMD SE430 - 20 |
Termination at Flat Roof Solid Substrate | OMD SE430 - 21 |
Termination at Sloped Roof | OMD SE430 - 22 |
Vertical Wall/Suspended Soffit Transition | OMD SE430 - 23 |
Transition at Soffit/Fascia Intersection | OMD SE430 - 24 |
Fascia/Uninsulated Soffit Transition | OMD SE430 - 25 |
Termination at Uninsulated Soffit Vent | OMD SE430 - 26 |
Horizontal Slip Joint at Slip Track | OMD SE430 - 27 |
Horizontal Slip Joint Substrate Change | OMD SE430 - 28 |
Horizontal Joint - at Stone Veneer | OMD SE430 - 29 |
Horizontal Termination - at Lap Siding | OMD SE430 - 30 |
Vertical Expansion Joing - EIFS | OMD SE430 - 31 |
Through-Wall Expansion Joint | OMD SE430 - 32 |
Vertical Expansion Joint - Flush and Recessed Options | OMD SE430 - 33 |
Vertical Expansion Joint - Double Seal Option | OMD SE430 - 34 |
Vertical Termination at Stone Veneer | OMD SE430 - 35 |
Penetrations | OMD SE430 - 36 |
Sign Attachment | OMD SE430 - 37 |
Aesthetic Reveals | OMD SE430 - 38 |
Recessed Graphics | OMD SE430 - 39 |
Projecting Graphics | OMD SE430 - 40 |
Dryvit makes no representation regarding conformity of its suggestions to model building codes, engineering criteria, specific applications or project locations. All components indicated in illustrations, as well as others that may be required for the integrity of the system shall be designed, detailed and engineered by representatives of the architect, owner or contractor to be in conformance with model codes, architectural and engineering requirements pertaining to specific building projects.
Dryvit makes no warranty, expressed or implied, as to the architectural design, engineering, or workmanship of projects utilizing Dryvit systems or products.
Last Updated: 04/13/2022