Detail Name | PDF File |
---|---|
CCP-2 Cutaway | CCP-2-1 |
Termination at Wood Window | CCP-2-2 |
Termination at Self Flashing Nail-on Window | CCP-2-3 |
Termination at Storefront Window - Jamb | CCP-2-4 |
Termination at Storefront Window - Head + Sill | CCP-2-5 |
Terminationi at Storefront Window - Setback | CCP-2-6 |
Termination at Concrete Foundation | CCP-2-7 |
Outside Corner | CCP-2-8 |
Inside Corner Detailt | CCP-2-9 |
Horizontal Flashing & Expansion Joint | CCP-2-10 |
Termination at Roof | CCP-2-11 |
Termination at Roof/Wall Intersection | CCP-2-12 |
Termination at Parapet/Wall Intersection | CCP-2-13 |
Parapet Flashing | CCP-2-14 |
Soffit with Continuous Vent | CCP-2-15 |
Soffit/Fascia Intersection | CCP-2-16 |
EPS Cornice | CCP-2-17 |
Expansion Joint Intersection | CCP-2-18 |
Horizontal or Vertical Expansion Joint | CCP-2-19 |
Termination at EIFS/Lap Siding | CCP-2-20 |
Two-Piece Horizontal Expansion Joint | CCP-2-21 |
Pipe Railing Attachment | CCP-2-22 |
Hose Bib Penetration | CCP-2-23 |
Sloped Sill | CCP-2-24 |
The architecture, engineering, and design of the project using the Tremco and Dryvit products from Tremco CPG Inc. are the responsibility of the project's design professional. All products and systems must comply with local building codes and standards. This detail is for general information and guidance only and Tremco CPG specifically disclaims any liability for the use of this detail. The project design professional determines, in its sole discretion, whether this detail or a functionally equivalent detail is best suited for the project. This detail is subject to change without notice. Contact Tremco or Dryvit Technical Services representatives to ensure you have the most recent version.
Dryvit Technical Support: (800) 556-7752 | engineering@dryvit.com